» HOME » PUBLIC PARTICIPATION » ENVIRONMENT » HISTORY & NEWS

Land Use & Impacts

» Draft Environmental Impact Report from original filing

*Table 1.3-1 “Summary of Land Requirements for the Approved Route” (Att. I, p. 14)
– Right of way (ROW) colocated within existing pipeline or electric transmission utility ROWs “to maximum extent possible”
– 143.7 acres of contractor yards (20 acres PA, 123.7 acres NY).
*Table 1.3-3 of the Environmental Consistency Summary (Att. I, 15-17)

Attachment I also details Construction Procedures in section 1.5